2013-2015 Airport Extension Munich
Execution and commissioning of indoor sprinkler and hydrant installations in accordance with the VdS standard, for:
- New Terminal: P+3, surface area per level – 24,600m², total surface area of sprinkler installations – 94,800m²;
- Boarding Gates Area: P+3, surface area per level – 20,400m², total surface area of sprinkler installations – 81,600m².