2008-2012 Airport Extension Viena
Execution and commissioning of indoor sprinkler and hydrant installations in accordance with the VdS standard, for:
1. New Terminal: P+4, surface area per level – 20,500m², total surface area of sprinkler installations – 102,500m²;
2. Boarding Gates Area: P+4, surface area per level – 17,100m², total surface area of sprinkler installations – 85,600m².