Portofolio - JTI Cigarette Factory Romania

"

2022-2023 JTI Cigarette Factory

Turn-key system (design, execution, testing and commissioning) of fire extinguishing installations with sprinklers, indoor and outdoor hydrants in compliance with the FM standard and Romanian regulations for:

  • “CRES” area with a total area of 1,900 m²;
  • Warehouse 1A – NTM Warehouse (including skylights) with a total area of 4,500 m²;
  • Warehouse 1A – NTM Warehouse Production and storage of flammable liquids – ceiling sprinklers and sprinklers in Raks 3 levels
  • Warehouse 1A- NTM Warehouse – office space 2 levels
  • Replacement of the electric pump including the related modifications in the Pumping Station

2020-2021 JTI Cigarette Factory

Turnkey system (design, execution, testing and commissioning) of fire extinguishing installations according with FM standard and Romanian regulations for:

  • Flavors Section – ACS Chamber and Foam Tank Installation
  • Flavors Section – Ceiling Sprinklers and Rack Sprinklers
  • Pump Station – Diesel Pump Replacement

2013-2014 JTI Cigarette Factory

  1. Turnkey system (design, execution, testing and commissioning) of fire extinguishing installations with sprinklers, indoor and outdoor hydrants in compliance with the FM standard and Romanian regulations for: Office Building with a total surface of 6,500 m².
  2. Turnkey system (design, execution, testing and commissioning) of fire extinguishing installations with sprinklers, water-glycol type in compliance with the FM standard and Romanian regulations for a new Waste Collection Center.

    2007-2010 JTI Cigarette Factory

    1. Turnkey system (design, execution, testing and commissioning) of fire extinguishing installations with sprinklers, indoor and outdoor hydrants in compliance with the FM standard and Romanian regulations for:
      • “CRES” area with a total surface of 1,900 m²;
      • Finished Products Warehouse with a total surface of 2,800 m²;
      • “Make & Pack” area with a total surface of 3,000 m²;
      • “Primary” area with a total surface of 1,900 m²;
      • “Cut Filler” area with a total surface of 1,600 m²;
      • Production Offices area with a total surface of 2,800 m².
    2. Turnkey system (design, execution, testing and commissioning) of two Pump Stations in compliance with the FM standard and Romanian regulations.